Featured project Municipal

Trunk main infiltration sealed under live flow

762mm sanitary main with chronic groundwater infiltration at multiple joints — sealed in three shifts with zero excavation and no service interruption.

762mm
Pipe ID
14
Joints sealed
3
Shifts on site
0
Excavation
100%
CCTV verified
Scope of work

The challenge

Persistent inflow and infiltration was overloading the municipal treatment system during wet-weather events. Conventional dig-and-replace would have closed a major arterial road for weeks. The municipality needed the leaks stopped fast, with proof of result.

Our approach

  • CCTV survey to locate and rank every active defect.
  • Hydrophobic polyurethane injected at each joint under pressure.
  • Live verification pass confirming each seal before moving on.
  • Final CCTV footage and a defect-by-defect completion report.

“They stopped the water without closing the road. We had the report in hand the same week.”

— Public Works Director
Recent work

More projects

Sanitary Trunk Main, Maple Ridge Municipal

Sanitary Trunk Main — Maple Ridge

Sewer & storm mains

Parkade Foundation, Burnaby Property Mgmt

Parkade Foundation — Burnaby

Foundation waterproofing

Reservoir Chamber, Coquitlam Municipal

Reservoir Chamber — Coquitlam

Manhole & chamber rehab

Elevator Pit, Strata, Vancouver Strata

Elevator Pit — Strata, Vancouver

Sumps & elevator pits