Featured project
Municipal
Trunk main infiltration sealed under live flow
762mm sanitary main with chronic groundwater infiltration at multiple joints — sealed in three shifts with zero excavation and no service interruption.
762mm
Pipe ID
14
Joints sealed
3
Shifts on site
0
Excavation
100%
CCTV verified
Scope of work
The challenge
Persistent inflow and infiltration was overloading the municipal treatment system during wet-weather events. Conventional dig-and-replace would have closed a major arterial road for weeks. The municipality needed the leaks stopped fast, with proof of result.
Our approach
- CCTV survey to locate and rank every active defect.
- Hydrophobic polyurethane injected at each joint under pressure.
- Live verification pass confirming each seal before moving on.
- Final CCTV footage and a defect-by-defect completion report.
“They stopped the water without closing the road. We had the report in hand the same week.”
— Public Works Director