All projects
Municipal

Reservoir Chamber — Coquitlam

Scope of work

The challenge

A municipal reservoir chamber showing infiltration at the bench and pipe penetrations, contributing to inflow during wet-weather events.

Our approach

  • CCTV survey to locate and rank each active defect.
  • Bench, frame, and pipe-penetration sealing.
  • Restored watertight integrity across the structure.
  • Final verification pass and completion report.